At long last, construction stared late in
June and the builders have been working flat out since then. It has been
really exciting watching the new practice take shape. If you would like to
have a peek at our building site follow this link.
The new practice has been
designed to overcome many of the difficulties that we currently
experience, Anne can finally come off a 15 year diet which was
necessitated by her very "slim line" reception area. She will assume command
of a properly sized reception area where it is reported that there is room
to swing a fairly large cat.
The new practice is linked
by 7 buses which stop right outside the practice. Additionally we have
purchased an area of land beside the practice which should provide ample
parking for our patients who come by car. The car park significantly increased our stress levels
with the purchase eventually going through only 3 days before the builders moved in.
Storage for bicycles will also
be available.
We have deliberately reduced the size of the
surgeries slightly to improve the layout of the workspace for
the team. Back problems are very common in the dental profession and have
in the past troubled many of us so we
were keen to try and design some of these problems out of the new
premises, after all no one likes a grumpy dentist!
|